Introduction
Sudarshan Chemicals is a global supplier of pigments that range from organic, inorganic and effect dyes to performance colourants, pearlescent pigments and speciality chemicals. Its B2B product range includes coatings, plastics, printing supplies, special application colours, and pigments used for cosmetics. The organisation works from more than 85 countries and has 60+ business partners.
Committed to environment, social and governance (ESG) goals in its industry, Sudarshan Chemicals focuses on sustainability in all its operations. It takes particular care to preserve biodiversity by investing in tools and technologies for environmentally-sound products. It also runs a CSR program with events focused on health, education and general welfare of women and children.
Business Challenge
- Shifting the data centre – The team had to shift its internal data to an outsourced data centre (DC) in a short time span of 7 days.
- Application migration – A number of applications – most of which were based on SAP – had to be transferred to new DC without affecting their performance.
- Risk of failure – The company did not have a detailed project plan to complete the migration and this meant high risks of failure, extended timelines and budget overlaps.
- Possibilities of data loss – The team was also worried about unexpected network issues and cybersecurity vulnerabilities that could lead to data loss during migration.
TTBS Solution
The data centre migration at TTBS considers the current data centre’s hardware and software capabilities, connections between the nodes, and network maps to ensure a seamless transition.
Our solution architect deployed Smart Internet – TTBS internet leased line solution – for three work locations owned by the business. And although the task of data transfer from its inhouse DC was internal, we supported this transition to ensure that the customer does not face any interruption in its operations once the resources crucial for work have been shifted to the new centre.
Sudarshan Chemicals had been using SAP applications for all its core business processes which is why it needed robust online service round-the-clock. With uncontended connectivity provided by Smart Internet, this was taken care of.
As for the transfer of data from internal to outsourced DC, the timeline was short and we deployed our finest resources to make the transition successful. The access to new data centre was completed in merely 4 days and its management was handed over to the company’s IT team.
In implementing this solution, the major aspects that we focused on were:
- Our team assessed the data centre’s portfolio to identify all dependencies and technical requirements for the smooth transfer of data and applications
- The next step was to define the architecture of the migration procedure and planning a test process while also deciding upon a method to transition to the new site.
- We organised the DC migration in batches by preparing data subsets and tested each category of data in parallel for timely transfer of assets.
- TTBS also reviewed audit trails and logs to ensure that the data has been properly migrated without any losses.
By migrating to Smartflo, our customer could allow their agents to work securely from any location. No comprehensive training was required to get them started. Features such as click-to-call for out bound campaigns, call barging-whispering-transfer, bespoke IVR for missed calls, and simultaneous rings for 100% response to each call contributed to enhanced productivity and performance.
Benefits
- High and symmetric download-upload speeds with Smart Internet that provides data connectivity service to the company
- No data losses with visibility of all assets at every step of data centre migration and backups of data before the move
- No interruption to business due to comprehensive planning and simultaneous movement of related data and applications
- Quick turnaround time by TTBS that completed the project in only 4 days as against the given timeline of 7 days
- Pre-production tests to eliminate risks associates with migration process based on certain assumptions
- Efficient monitoring and reporting, keeping stakeholders informed on project progress and optimizing ROI through data monitoring at new DC.

To download the case study enter your details
"TTBS team understood our connectivity needs and provided end-to-end support with appropriate co-ordination and delivered the project before time, which is much appreciated" Manish Pawar, Infra Lead
You may also like
Connect With Us
Connect on
WhatsApp
Mon - Fri
10 am 6 pm